The City of New York is committed to achieving excellence in the design and construction of its capital program, and building on the tradition of innovation in architecture and engineering that has contributed to the City's prestige as a global destination. As part of this effort, DDC is pleased to announce the contracting opportunities listed below.
Please note all solicitations will be released using New York City's digital Procurement and Sourcing Solutions Portal (PASSPort). All Request for Proposals (RFP) documents for your review will be accessible through PASSPort. All responses, including but not limited to the Technical Proposal (Questionnaire) and Price Proposal (Items) must be submitted through the PASSPort System. If you are a vendor who wishes to respond to the RFP and you do not have a PASSPort account, please click here and follow the instructions to set up a PASSPort account. For more information regarding instructions on how to respond to a solicitation released in PASSPort, please click here.
|
|
|
|
1 |
|
8502020EM0001P 8502020EM0002P 8502020EM0003P 8502020EM0007P 8502020EM0008P 8502020EM0009P |
|
RQ_PV, On-Call Emergency Contracts for Construction Work and Construction Related Services for Category 3, Category 4&5 and Category 9 Addendum 1, Posted 9/4/2020 (Addendum No. 1) Pre-Proposal Conference Attendance, Posted 9/15/2020 Pre-Proposal Conference PowerPoint Presentation, Posted 9/15/2020 Addendum 2, Posted 10/1/2020 (Addendum No. 3) Addendum 3, Posted 9/28/2020 (Addendum No. 2) Addendum 4, Posted 10/7/2020 (Addendum No. 4) Addendum 5, Posted 10/8/2020 (Addendum No. 5) Addendum 6, Posted 10/9/2020 (Addendum No. 6) |
|
Final List |
2 |
|
8502020VP0001P |
|
Request for Expressions of Interest (“RFEI”) to provide owner advisor services for Infrastructure or Public Buildings design-build projects Addendum 1, Posted 9/23/2019 (Addendum No. 1) |
|
In Process |
3 |
|
8502019RQ0001P |
|
ENGINSP6, Requirements Contract for Professional Services for Inspection and Material Testing of Water Main and Sewer Pipes, Appurtenances, and Steel Structures at Various Locations Throughout the United States and Foreign Countries MWBE Goals, Posted 8/22/2019 (MWBE Goals) Addendum 1, Posted 9/6/2019 Pre-Proposal Conference Attendance Sheet, Posted 9/10/2019 Addendum 2, Posted 9/20/2019 (Addendum) Pre-Proposal Conference Minutes, Posted 9/20/2019 Addendum 3, Posted 9/23/2019 |
|
Cancelled |
4 |
|
8502019VP0010P |
|
Request for Expressions of Interest (“RFEI”) to evaluate vendor interest in providing all services necessary and required to provide management, oversight, and coordination of a community relations program Addendum 1, Posted 6/28/2019 (Addendum No. 1) Addendum 2, Posted 7/11/2019 (Addendum No. 2) |
|
In Process |
5 |
|
8502018HW0055P |
|
HWDRCW06, Requirements Contracts for Engineering Design and Related Services for Bridges, Step Streets, Retaining Walls/Bulkheads and Other Miscellaneous Structures, Citywide MWBE Goals, Posted 4/17/2019 Addendum 1, Posted 5/1/2019 Addendum 2, Posted 5/16/2019 Addendum 3, Posted 6/10/2019 Addendum 4, Posted 6/11/2019 |
|
Final List |
6 |
|
8502019HW0017P |
|
HWK1148, Preliminary and Final Design Services for Jewel Street Area Reconstruction, Boroughs of Brooklyn and Queens The reference documents for the project listed are now available for review. Please contact the designated Contract Managers for an appointment. MWBE Goals, Posted 3/25/2019 (MWBE Goals) Addendum 1, Posted 3/27/2019 (Addendum No.1) Addendum 2, Posted 4/18/2019 (Addendum No.2) Addendum 3, Posted 5/3/2019 (Addendum No.3) Addendum 4, Posted 5/14/2019 (Addendum No.4) |
|
On Hold |
7 |
|
8502019VP0002P |
|
Resident Engineering Inspection Services for the Reconstruction of Far Rockaway and Urban Design Street Scape, Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 11/28/2018 (MWBE Goals) Addendum 1, Posted 12/4/2018 Addendum 2, Posted 12/7/2018 Addendum 3, Posted 12/11/2018 Addendum 4, Posted 12/19/2018 Addendum 5, Posted 12/28/2018 |
|
Cancelled |
8 |
|
8502018VP0006P 8502018VP0007P 8502018VP0008P 8502018VP0009P 8502018VP0010P 8502018VP0011P 8502018VP0012P 8502018VP0013P 8502018VP0014P 8502018VP0015P |
|
DCE-MEGA, Ten Architectural & Engineering Design Requirements Contracts for Mega Projects, Citywide MWBE Goals, Posted 2/9/2018 (MWBE Goals) Addendum 1, Posted 2/14/2018 (Addendum 1) Addendum 2, Posted 2/26/2018 (Addendum No. 2) Pre-Proposal Conference Attendance Sheet, Posted 3/1/2018 Pre-Proposal Conference PowerPoint Presentation, Posted 3/1/2018 Addendum 3, Posted 3/6/2018 (Addendum No. 3) Addendum 4, Posted 3/7/2018 (Addendum No. 4) Addendum 5, Posted 3/8/2018 (Addendum No. 5) Addendum 6, Posted 3/9/2018 (Addendum No. 6) |
|
Cancelled |
9 |
|
8502017RQ0055P 8502017RQ0056P 8502017RQ0057P 8502017RQ0060P 8502017RQ0061P |
|
Requirements Contracts for Special Inspections and Laboratory Services for Micro, Small, Medium, and Large Projects, Citywide MWBE Goals, Posted 7/20/2017 (MWBE Goals) Pre-Proposal Conference Sign In Sheet, 8/4/17, Posted 8/4/2017 Pre-Proposal Conference Minutes of August 4, 2017, Posted 8/15/2017 Addendum 1, Posted 8/15/2017 (Addendum No.1) FAQs for Special Inspections Reqs Contract Pre-Proposal Mtg, Posted 8/17/2017 Addendum 2, Posted 8/21/2017 (Addendum No.2) Addendum 3, Posted 8/21/2017 (Addendum No.3) Addendum 4, Posted 8/24/2017 (Addendum No.4) Addendum 5, Posted 8/25/2017 (Addendum No.5) |
|
Final List |
10 |
|
8502017EM0002P 8502017EM0003P 8502017EM0004P |
|
Disaster Recovery: On-Call Contracts for Project Management and Related Services for Emergency Work Involving Design, Construction, Construction Mangement Services, and Procurement of Goods. Work Category One - Critical Public Facility Restoration. Addendum 1, Posted 6/27/2017 (Addendum No.1) Pre-Proposal Conference Sign In Sheet, 6/27/17, Posted 6/27/2017 Pre-Proposal Conference Presentation, Posted 6/27/2017 Addendum 2, Posted 7/13/2017 (Addendum No.2) |
|
In Process |
11 |
|
8502017JJ0003P |
|
CJCREN, Design/Construction Management/Construction Services for the Construction of a new Crossroads Juvenile Justice Center, Borough of Brooklyn MWBE Goals, Posted 5/4/2017 (MWBE Goals) ACS CPSD Volume 1 Executive Summary, Posted 5/4/2017 ACS CPSD Volume 2 Main Report, Posted 5/4/2017 ACS CPSD Volume 2A Addendum, Posted 5/5/2017 Pre-Proposal Conference - Sign in attendance sheet, Posted 5/23/2017 Pre-Proposal Conference - PowerPoint Presentation, Posted 5/24/2017 Addendum 1, Posted 6/2/2017 (Addendum No. 1) Addendum 2, Posted 6/7/2017 (Addendum No. 2) |
|
In Process |
12 |
|
8502016VP0109P |
|
JOCS_DDC, Requirements Contract for Consulting Services for Job Order Contracting System, Citywide MWBE Goals, Posted 4/6/2017 (MWBE Goals) Addendum 1, Posted 4/6/2017 (Addendum No.1) Appendix 2, Posted 4/6/2017 Appendix 3, Posted 4/6/2017 Addendum 2, Posted 4/13/2017 (Addendum No.2) |
|
In Process |
13 |
|
8502017JJ0001P |
|
Re-construction of the New York City Administration of Children’s Services (ACS) Existing Juvenile Detention Facility in Brooklyn Addendum 1, Posted 2/1/2017 (Addendum #1) Addendum 2, Posted 2/6/2017 (Addendum #2) |
|
In Process |
14 |
|
8502017RQ0032P |
|
RQ_A&E, Engineering Design Requirements Contracts for Renovation Projects involving HVAC, Fire Protection, Electrical and Plumbing for Micro, Small, Medium and Large Projects, Citywide MWBE Goals, Posted 12/23/2016 Addendum 1, Posted 1/25/2017 (Addendum #1) Pre-Proposal Conference Attendance Sheet held on 1/11/2017, Posted 1/11/2017 Addendum 2, Posted 1/25/2017 (Addendum #2) Minutes for Pre-Proposal Conference, Posted 1/20/2017 Addendum 3, Posted 1/25/2017 (Addendum #3) Addendum 4, Posted 1/25/2017 (Addendum #4) |
|
Final List |
15 |
|
8502016TR0003P |
|
HWHARPER, CM/Design/Build for Reconstruction of Harper Street Asphalt Plant, Borough of Queens MWBE Goals, Posted 9/8/2016 (MWBE Requirements) PreProposal Conference Sign in Sheets, Posted 9/22/2016 Minutes for Pre-Proposal Meeting, Posted 9/29/2016 Addendum 1, Posted 9/29/2016 (Addendum 1) Addendum 2, Posted 10/5/2016 (Addendum #2) |
|
In Process |
16 |
|
8502016VP0104P 8502016VP0105P 8502016VP0106P 8502016VP0107P 8502016VP0108P |
|
Requirements Contracts for Construction Management Services for Micro, Small, Medium and Large Projects, Citywide MWBE Goals, Posted 5/19/2016 June 2, 2016 Pre-Proposal Conference Attendance Sheets, Posted 6/2/2016 June 2, 2016 Pre-Proposal Conference PowerPoint Presentation, Posted 6/2/2016 Addendum 1, Posted 6/10/2016 June 2, 2016 Pre-Proposal Conference Minutes, Posted 6/14/2016 |
|
In Process |
17 |
|
8502016EM0011P 8502016EM0012P 8502016EM0015P 8502016EM0025P 8502016EM0026P 8502016EM0027P 8502016EM0028P 8502016EM0030P 8502016EM0032P 8502016EM0033P 8502016EM0034P 8502016EM0035P 8502016EM0036P 8502016EM0037P |
|
CONSTRUCTION MANAGEMENT DESIGN BUILD FOR DISASTER RECOVERY: ONCALL CONTRACTS FOR PROJECT MANAGEMENT AND RELATED SERVICES FOR EMERGENCY WORK INVOLVING DESIGN, CONSTRUCTION, CONSTRUCTION MANAGEMENT SERVICES, AND PROCUREMENT OF GOODS February 23, 2016 Pre-Proposal PowerPoint Presentation, Posted 2/23/2016 February 23, 2016 Pre-Proposal Conference Attendance Sheet, Posted 2/23/2016 Addendum 1, Posted 3/1/2016 (Addendum No. 1) Addendum 2, Posted 3/11/2016 (Addendum No. 2) Conference II- Attendance Sheet, Posted 3/23/2016 Addendum 3, Posted 3/31/2016 (Addendum No. 3) Addendum 4, Posted 4/1/2016 (Questions and Answers) Addendum 5, Posted 4/4/2016 (Addendum No. 5-Request For Proposal (RFP) Revised) |
|
Final List |
18 |
|
8502016HW0034P |
|
P-415PAS2, Preliminary and Final Design and Construction Support Services for: Passerelle Pedestrian Bridge Over NYC Transit Yard and Meridian Road, Borough of Queens MWBE Goals, Posted 2/8/2016 February 18, 2016, Pre-Proposal Conference Attendance Sheet, Posted 2/19/2016 Pre- proposal Conference Minutes February 18, 2016, Posted 2/26/2016 Addendum 1, Posted 2/29/2016 (Addendum NO.1) |
|
In Process |
19 |
|
8502016HW0002P |
|
Preliminary & Final Design Services for Woodhaven Boulevard Select Bus Services (SBS), Borough of Queens Pre-Proposal Conference Attendance Sheet, Posted 9/4/2015 Addendum 1, Posted 9/10/2015 Minutes for Pre-Proposal Conference, Posted 9/10/2015 Addendum 2, Posted 9/10/2015 Addendum 3, Posted 9/14/2015 Addendum 4, Posted 9/24/2015 |
|
In Process |
20 |
|
8502015TR0005P |
|
RFP - Request For Proposal - S216-404A, Construction Management Services for the New Gansevoort Marine transfer Station, Borough of Manhattan MWBE Goals, Posted 6/22/2015 July 7, 2015 Pre-Proposal Conference Attendance Sheet, Posted 7/8/2015 Pre-Proposal Conference Minutes July 7, 2015, Posted 7/16/2015 |
|
In Process |
21 |
|
8502015VP0010P 8502015VP0011P 8502015VP0012P |
|
RFP-Request for Proposal-V.C.P Requirements Contract for Commissioning and Related Services for Various Projects, Citywide MWBE Goals, Posted 3/9/2015 Addendum 1, Posted 3/18/2015 Addendum 2, Posted 3/20/2015 Addendum 3, Posted 3/23/2015 March 23, 2015 Pre-Proposal Conference Attendance Sheet, Posted 3/23/2015 March 23, 2015 Pre-Proposal Conference Minutes, Posted 3/25/2015 |
|
In Process |
22 |
|
8502014RQ0009P 8502014RQ0010P |
|
RQ_A&E Requirements Contracts for Architectural, Engineering and Construction Related Services for Roofing and/or Roof-Related Assemblies, Citywide MWBE Goals, Posted 7/31/2014 Addendum 1, Posted 8/6/2014 August 14, 2014 Pre-Proposal Conference Attendance Sheet, Posted 8/18/2014 Pre-Proposal Conference Minutes August 14, 2014, Posted 8/20/2014 |
|
Final List |
23 |
|
8502014HW0044P |
|
Requirements Contracts for Resident Engineering Inspection Services for Small Infrastructure Projects, Citywide MWBE Goals, Posted 6/12/2014 Addendum 1, Posted 6/17/2014 |
|
Final List |
24 |
|
8502014WM0019P |
|
REI Services for Water Main Connection at Washington Square Park, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 5/12/2014 |
|
In Process |
25 |
|
8502014VP0031P 8502014VP0032P 8502014VP0033P |
|
RQ_A&E, Requirements Contracts for Landscape Architectural, Engineering and Construction Related Services for Various Projects, Citywide MWBE Goals, Posted 3/6/2014 Addendum 1, Posted 3/17/2014 |
|
In Process |
26 |
|
8502013HW0078P |
|
HWK1668A, Pre-Scoping Services Willoughby Street Limited Access Streetscape, Borough of Brooklyn MWBE Goals, Posted 8/19/2013 Addendum 1, Posted 8/20/2013 |
|
In Process |
27 |
|
8502010WM0008P |
|
MED599, Resident Engineering Inspection Services for Trunk Water Mains in West 48th Street from 10th Avenue to Broadway, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 3/4/2010 Addendum 1, Posted 3/24/2010 |
|
In Process |
28 |
|
8502009HW0053P |
|
RESIDENT ENGINEERING INSPECTION SERVICES AND MINOR DESIGN SERVICES FOR THE RECONSTRUCTION AND REPLACEMENT OF COMPLEX PEDESTRIAN RAMPS FOR THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX MWBE Goals, Posted 6/18/2009 |
|
In Process |
29 |
|
8502009HW0044P |
|
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS FOR THE BOROUGHS OF QUEENS, MANHATTAN, THE BRONX AND STATEN ISLAND MWBE Goals, Posted 3/26/2009 |
|
Final List |
30 |
|
8502009CR0002P |
|
New Bronx Detention Complex at Hunts Point, Borough of the Bronx MWBE Goals, Posted 1/20/2009 Addendum 1, Posted 1/23/2009 Addendum 2, Posted 1/23/2009 Pre-Proposal Conference minutes, Posted 2/9/2009 |
|
In Process |
31 |
|
8502008HW0050P |
|
REI SERVICES FOR THE RECONSTRUCTION OF WEST 33RD STREET BETWEEN 10TH AVE & 11TH AVE The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 1/22/2008 Addendum 1, Posted 2/14/2008 |
|
In Process |
32 |
|
8502007HW0072P |
|
REI Services for Improvements to Hylan Boulevard Intersection, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment MWBE Goals, Posted 5/7/2007 Addendum 1, Posted 5/11/2007 |
|
In Process |
33 |
|
8502007SE0020P |
|
REI Services for the Construction of Sanitary Sewers in Nashville Avenue, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/4/2007 Addendum 1, Posted 4/6/2007 (Cancellation Notice) |
|
In Process |
34 |
|
8502007SE0019P |
|
REI SERVICES FOR SEWER AND WATER MAIN WORK IN RICHMOND TERRACE, BOROUGH OF STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/2/2007 |
|
In Process |
35 |
|
8502007HW0063P |
|
REI SERVICES FOR THE RECONSTRUCTION OF W 181ST STREET/RIVERSIDE DRIVE RETAINING WALL MWBE Goals, Posted 2/14/2007 Addendum 1, Posted 3/13/2007 (Cancellation Notice) |
|
In Process |
36 |
|
8502007RQ0001P 8502007RQ0002P 8502007RQ0003P 8502007RQ0004P 8502007RQ0005P |
|
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 9/14/2006 |
|
In Process |
37 |
|
8502005SE0058P |
|
SER002271, Resident Engineering Inspection Services for the Construction of Sanitary & Storm Sewers and Best Management Practice (BMP) Structures in Lemon Creek Watershed Area, Borough of Staten Island. |
|
In Process |
38 |
|
8502006HW0059P 8502006HW0060P 8502006HW0061P |
|
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 1/24/2006 Addendum 2, Posted 2/7/2006 |
|
In Process |
39 |
|
8502006HW0070P |
|
Resident Engineering Inspection Services for the Reconstruction of Havemeyer Avenue Area, Borough of the Bronx |
|
In Process |
40 |
|
8502006PK0001P |
|
Architectural and Engineering Design Requirements Contract for the Renovation of Various Stadia Projects Addendum 1, Posted 3/20/2006 (3/9/06 Meeting Minutes) Addendum 2, Posted 3/24/2006 Addendum 3, Posted 4/3/2006 (Due Date April 10, 2006) |
|
In Process |
41 |
|
8502006SE0015P |
|
SE-777, Resident Engineering Inspection Services for Construction of Sanitary and Storm Sewers and Best Management Practice (BMP) Structures in North Railroad Street, Borough of Staten Island |
|
In Process |